Independent cost estimating · the core of the practice

Independent cost estimating, without contractor bias.

TCMG works as an independent cost estimating consultant to public and private project teams that need reliable budgets, third-party estimate reviews, and construction cost validation — from someone with no stake in who wins the work.

  • 30+ yrs estimating buildings
  • >$1B estimated in construction value
  • within 5% estimate accuracy
  • $500K–$900M project range

Hundreds of estimates delivered.

Estimating rigor: CSI MasterFormat (Divisions 00–33).

Why teams bring in an independent estimator

  • They need an independent cost opinion before committing to a budget.
  • They need an estimate reviewed against contractor pricing or design-team assumptions.
  • They need third-party cost validation for public accountability.
  • They need quantity takeoffs and pricing support during design or preconstruction.
  • They need value engineering ideas before final decisions are made.
Construction drawings, scale, and calculator used to prepare an independent cost estimate

What TCMG estimates

Every engagement is structured to CSI MasterFormat, Divisions 00–33, so the number is complete and comparable division to division.

ServiceWhat it meansBuyer value
Conceptual Estimates Early-stage cost opinions for planning, feasibility, and funding. Helps teams understand realistic budgets before decisions are locked in.
Design Phase Estimates SD, DD, and CD estimates as drawings progress. Keeps design decisions aligned with budget expectations.
Independent Estimate Reviews Third-party review of contractor, architect, engineer, or internal estimates. Creates confidence that pricing is reasonable and complete.
Quantity Takeoffs Detailed measurement of construction scope. Supports accurate pricing and reduces missed scope.
Budget Validation Independent confirmation of budgets and cost assumptions. Supports public agencies, owners, and design teams with defensible numbers.
Value Engineering Review of systems, finishes, details, and scope alternatives. Identifies cost-saving options without undermining project intent.

The difference

Field experience, not just spreadsheet pricing

TCMG’s estimating work is informed by real construction experience, not just spreadsheet pricing. This field-based perspective helps identify missing scope, unrealistic assumptions, constructability concerns, and budget risks earlier in the process.

Proof, in the format buyers know

What a TCMG estimate looks like

A TCMG estimate in CSI MasterFormat — Cover and Summary shown, the Div 00–33 detail protected.

Cover Summary 000102030405060708091011121314212223262728313233 A&E Labor Takeoff
MOCK — sample data only

Sample K-12 Facility — 60% CD

Project
Sample K-12 Facility (illustrative)
Phase
60% Construction Documents
Estimate basis
CSI MasterFormat, Divisions 00–33
Gross area
~85,000 SF (illustrative)
Prepared by
TCMG — independent cost estimate

Color legend

  • Inputs
  • Formulas
  • TBD
  • Owner-provided
  • Alternates

Summary of probable cost

DivDescriptionSubtotal
01General Requirements—
03Concrete—
05Metals—
09Finishes—
23HVAC—
26Electrical—
Total probable cost— protected —

Values neutralized for this preview. A real estimate carries fully priced Div 00–33 line items.

Division 03 · Concrete — detail view

How one division is measured underneath the summary above.

LineDescriptionQtyUnitCost
03 30 53.10 Continuous footings, 3,000 psi 42.6 CY —
03 30 53.20 Spread footings, 3,000 psi 18.4 CY —
03 30 53.40 Foundation walls, 8 in. 1,240 SF —
03 21 11.60 Reinforcing steel, #5 bars, continuous 12,300 LB —
03 30 53.55 Slab on grade, 4 in., welded wire fabric 26,800 SF —
03 15 16.20 Expansion and control joints 940 LF —
03 35 13.30 Power trowel finish 26,800 SF —
03 39 23.13 Curing compound, membrane 26,800 SF —

Divisions 00–33 continue. Full detail supplied with the estimate.

Request an independent cost estimate

Tell us what you're building and where it sits in design. We'll follow up personally.

Your inquiry goes directly to TCMG. Please do not include confidential project documents here.

Frequently asked questions

What does TCMG do?

TCMG — The Construction Management Group of CO, LLC — is an independent cost estimating practice in Colorado Springs, Colorado. It prepares unbiased construction cost estimates for buildings, and also offers estimator consulting and estimator training for contractors.

What is an independent cost estimator?

An independent cost estimator prepares a construction cost estimate that isn’t tied to a contractor bidding the work, so the owner or design team gets an unbiased number for budgeting and bid comparison.

How accurate are TCMG’s estimates?

TCMG estimates land within 5%, backed by 30+ years of experience and more than $1 billion of construction estimated across hundreds of estimates.

What kinds of projects does TCMG estimate?

Buildings first — commercial, institutional, healthcare, educational, public safety, and similar — typically ranging from $500K to $900M, along with the utility, civil, and sitework scopes that come with them.

Where does TCMG work?

Nationwide. TCMG is based in Colorado Springs and estimates projects across the United States, including base estimating work for general contractors operating in multiple states. The estimate is built from the drawing set, so the work travels even where the office does not.